What accessories are needed to make the ZTD10 gas booster pump into a system?

    The customer's on-site driving pressure is 8bar-9bar, which is very stable, but currently needs to be increased to 50bar to check a 100cm ³ valve, hoping that the larger the flow rate, the better;


    According to the requirements, the configuration is as follows:


    (1) One ZTD10 Feentor gas booster pump (single-stage double acting);


    (2) High pressure pipeline 1.5M


    (3) 1 high-pressure output pressure gauge (8MPA)


    (4) Oil water separator (binary unit)


    (5) High pressure ball valve (20MPA)


    ZTD10Nitrogen booster pump

    本站使用百度智能门户搭建 管理登录