What are the general steps for the airtightness testing equipment of Feentor industrial control computer?

    1、 Operation process of air tightness testing equipment for industrial control computers.


    1. Match the corresponding thread seals based on the thread size, drive inlet, and medium inlet of the tested component


    2. Add lubricating oil to the oil mist generator of the binary system. For the south, use 10 # or 20 # mechanical oil, and for the north, use antifreeze mechanical oil or low pour point hydraulic oil in winter.


    3. Connect the air source and adjust the pressure reducing valve on the binary unit to ensure that the air pressure is not greater than 0.7MPa (65kgf/cm ²).


    4. Open the computer page, enter the pressure of the tested component and other options, click start, the device will automatically increase pressure, observe the curve changes, and enter the holding time to observe the pressure changes when the pressure is reached.


    1. Test OK: Save the test record and print the test record.


    The core component of the airtightness testing equipment is a pneumatic booster device powered by a gas booster pump from Feentor. Details http://www.tz-fet.com/


    本站使用百度智能门户搭建 管理登录